Skip to content
AdamSleep

Made to order

Container production, built to your specification.

You define the product; we price it, sample it, produce it and load it. From the first container you can run it under your own label.

How an order runs

Five steps from your first message to a container on the water.

  1. 01

    Specification

    Send your model mix, sizes and target specification. Or simply the product you want us to match.

  2. 02

    Quotation

    Price, lead time and a container loading plan within two business days.

  3. 03

    Sample

    We produce a sample for your approval before the main run starts.

  4. 04

    Production

    25 to 35 days, with progress updates from the line.

  5. 05

    Loading & shipping

    Roll-packed, loaded to the agreed plan, certification documents issued.

What you specify

Every line below is yours to set. If something is not listed, just ask; the line is flexible.

Dimensions
EU and UK standard matrices, or custom sizes on request.
Spring system
Bonnell or pocket spring, 3 to 7 comfort zones.
Foam
HR, cold cure, viscoelastic or latex, 25 to 45 kg/m³.
Height
18 to 32 cm, with or without a pillow top.
Cover & quilting
Your fabric and quilt design, or a selection from our range.
Firmness
Soft, medium or firm. Matched to a sample if you have one.
Finishing
Handles, ventilation, edge support and border detail.
Label & packaging
Your brand, labels, barcodes and carton print.

What is inside

A pocket spring build, layer by layer. Every layer below is specified by you.

What is insideA pocket spring build, layer by layer. Every layer below is specified by you.18 to 32 cm3 to 7 zonesQuilted coverYour fabric, 300 to 500 g/m²Comfort layerMemory foam or latex, 3 to 6 cmTransition foamHR foam, 30 to 45 kg/m³Pocket spring coreIndividually encased coils, 2.0 to 2.2 mm wireEdge supportReinforced foam frame on all four sidesBase layerHR foam with non-slip underside

Commercial terms

Minimum order
1 × 40'HC
Production lead time
25–35 days
Incoterms
EXW · FOB · CIF
Sampling
Before the main run
Documentation
Issued with every shipment

From one unit to a container

Start with one mattress. Scale to a container.

You do not have to commit a container to a supplier you have never worked with. There is no minimum on our Belgian stock: order one mattress or a full pallet, sell it, and see how we handle an order. When it works, we plan the container.

  1. 1

    Order what you need from stock

    No minimum. From a single mattress upwards, delivered from Belgium in 2 to 5 working days.

  2. 2

    Put it in front of your customers

    Test the build quality, the firmness and how the range sells in your market.

  3. 3

    Move to container production

    Once the range is proven, we build it to your specification and your label, priced by the container.

The cost of finding out whether we are the right supplier is one mattress.

See the stock range

Logistics

Work out your container before you ask.

The calculator gives an indicative unit count per container for any mattress size, so you can size the order before sending it.

Open the container calculator

Tell us what you need, from stock or from the line.

Send your model mix, quantities and delivery address or port. Stock orders are confirmed the same day; container quotations within two business days.

Request a quotation